Numbers first. Then design. Then build.

A deliberate sequence, because reversing it is how fit-outs overrun. Here is what happens between your first call and your keys.

01

Brief and benchmark

One call covers the space, the headcount and the handover date. We translate that into a scope and a costed budget band drawn from benchmarked rates, before a single drawing is signed off.

02

Engineer before you draw

Heat load, electrical load, seating capacity and circulation are calculated first. These are the decisions that quietly set the budget, so they are settled while they are still cheap to change.

03

Design to the budget

Design develops against the agreed number. Every material and specification choice shows its cost impact in the same view, so a change is a decision, not a surprise.

04

Procure direct

Furniture and materials are bought straight from the manufacturers, with no agency layer. Quality is checked on site, not on a delivery note.

05

Build and report

One site team, one programme, and a written progress and cost report every week. Variations are priced and approved before they are executed.

06

Reconcile and hand over

The final account is reconciled line by line against the BOQ you approved. You get the keys, the close-out pack, the warranties and the AMC.

Rooted in numbers

We price from evidence, not a hunch.

Every quote we send is checked against a benchmark of real, delivered commercial fit-out costs, item by item, trade by trade. You see exactly where your number sits: fair, tight or padded.

01

A rate you can check

Every line carries a unit and the basis it is built from, so your own team can test it.

02

Calculation over convention

Tonnage from heat load, cable from a load schedule, seats from real occupancy, not rules of thumb.

03

One accountable team

The people who priced it are the people who build it and answer for it afterwards.

04

Nothing verbal

Scope, exclusions, contingency rules and warranty terms are written down before work starts.

What you receive

Documents, not assurances.

Costed budget bandLine-item BOQLoad and capacity calculationsWeekly progress reportVariation registerReconciled final accountWarranty certificatesAMC schedule
Exact deliverables depend on scope; they are listed in your proposal before work starts.
Start with the number→
On site

Planned weekly. Checked daily.

01 · Schedule

Planned weekly, checked daily

  • Two-week look-ahead agreed every Monday
  • Morning huddle on site before work starts
  • We publish plan reliability: the share of promised tasks actually done
02 · Safety

No work without a check

  • Induction before day one, PPE checked at the gate
  • Daily toolbox talk logged
  • Written permits for hot work, live electrical and work at height
  • Fire watch after every hot-work shift
  • Near-misses logged, closed and shown to the client
03 · Hygiene

Your office keeps working

  • Work zones sealed and AC returns blanked so dust stays out of your air
  • HEPA vacuums and wet cutting, no dry sweeping
  • Noisy work in agreed windows, notified a day ahead
  • Debris out daily, covered, by a fixed route
  • Daily clean-down signed off
Project dashboard

You see what we see.

Every project gets a live dashboard and a site log updated daily from the floor, plus a one-page report every Monday.

  • Every rupee against the approved budget
  • Decisions we need from you, with deadlines
  • Plan vs actual, every week
Client workspace dashboard with progress, budget, schedule and site log
One-page weekly progress report sample
Weekly report

One page, every Monday.

  1. What got done, and what did not, with the reason.
  2. The next two weeks, and what must be ready first.
  3. Every change order, priced before it is built.
  4. Safety and hygiene, scored daily.