Four ways to work with us, or all four, end to end.
Each service stands on its own. Together they cover a project from the first line of the brief to the day your team moves in.
Design & Build
One team from the first sketch to the day the keys change hands, against one number you can hold us to.
We take the brief, translate it into a costed scope, and only then start drawing. Design develops inside the budget rather than around it, so the specification you approve is the specification that gets built.
Civil works, joinery, ceilings, flooring, MEP, HVAC, low-voltage and furniture sit in a single BOQ with one accountable team behind it. No gaps between trades for a cost to hide in.
Furniture
Specified to your space and budget, bought direct from the brand, warranted for five years.
Workstations, task seating, meeting tables, soft seating, storage and custom joinery, specified against how your teams actually sit and move, not against a catalogue page.
Because we buy direct from manufacturers, there is no agency markup between you and the maker, and warranty claims are handled by people who answer to us.
Project Management Consulting
Independent control of cost, quality and timeline when the contractors are yours.
Sometimes the contractor is already appointed, or the landlord's team is doing the base build. We come in as your side of the table: reading the BOQ, testing the rates, and holding the programme.
Two decades of PMC work sit behind the rate library we test your quotes against. You see where each number sits, fair, tight or padded, before you sign anything.
FlexFit, on-lease fit-out
The same design, build and furniture, funded by us. You pay one monthly charge for the term of your lease, with maintenance included and nothing on your books as capital expenditure.
How fit-outs are priced, written down.
What an office fit-out actually costs per sq ft in India
A per-sq-ft rate is a starting point, not a price. Here is what sits inside the number, and which four decisions move it most.
Read →
How to read a fit-out BOQ line by line
A BOQ is a contract in spreadsheet form. Six checks tell you whether the one in front of you is priced or padded.
Read →
Why HVAC sizing decides your fit-out budget
HVAC is 12–18% of a fit-out capital cost and most of its running cost. Sizing it by thumb rule is the most expensive shortcut in the industry.
Read →



